![]() ![]() of Aerocity to Tughlakabad Corridor of Phase-IV of Delhi MRTS. During technical evaluation, STEC was disqualified.īrief Scope: Design and Construction of Twin Tunnel (Up & Down Line) by Shield TBM, Cut and Cover Tunnel box and four Underground stations namely Aerocity, Mahipalpur, Vasant Kunj and Kishangarh with Entry/Exits & Connecting subways from chainage (-) 760 mt. Technical bids were opened in August to reveal 7 bidders. 1349.37 crore, but I’m not entirely sure if that’s still the current value. This 6.116 km Aerocity – Kishangarh section is on the western-end of the 23.622 km Silver Line and comprises of 4 stations at Aerocity, Mahipalpur, Vasant Kunj and Kishangarh.ĭMRC previously indicated this section to cost Rs. During technical evaluation, HCC – JMC JV and STEC were disqualified.īrief Scope: Design and Construction of Underground UP & Down Tunnels by Shield TBM from end of Cut & Cover tunnel near Sangam Vihar metro Station up to existing Sarita Vihar depot, Underground Ramp and Cut & Cover Tunnels near Sangam Vihar and Tughlakabad metro station and Underground Metro Stations at Maa Anandmayee Marg, Tughlakabad Railway Colony and Tughlakabad including Retrieval/Launching shafts on Aerocity Tughlakabad corridor of Delhi MRTS Project of Ph-IV Alignment of Delhi Metro Silver Line’s Package DC-07 – view Phase 4 route map & infoĭC-07’s design details such as crossover locations and TBM launching shafts can be viewed here. Technical bids were opened in August to reveal 6 bidders. The package’s scope now includes tunnels all the way up to the existing Sarita Vihar Depot, which will be augmented to stable and maintain the Silver Line’s train-sets. 1365.51 crore, but that was up to only Tughlakabad Station. This 6.981 km section on the eastern side of the 23.622 km Silver Line will connect Sangam Vihar Station’s east-end and Sarita Vihar Depot via 3 stations at Maa Anandmayee Marg, Tughlakabad Railway Colony, and Tughlakabad where it will form an interchange with the Violet Line’s station built in Phase 2.ĭMRC had previously estimated it to cost Rs. DC-05’s design details such as crossover and ramp locations can be viewed here. ![]() The assigned contractor will be required to use at least 4 tunnel boring machines (TBMs). Alignment of Delhi Metro Magenta Line’s Package DC-05 – view Phase 4 route map with all stations’ exact locations marked Ashram Corridor (Line-8 Ext.) of Phase-IV of Delhi MRTS. Derawal Nagar, Ghanta Ghar, Pulbangash, Sadar Bazar, Nabi Karim & Ramakrishna Ashram Marg Including Architectural Finishing, Water supply, Sanitary installation, Drainage works of stations on Janakpuri West to R.K. Technical bids were opened in September to reveal 4 bidders.īrief Scope: Design & Construction of Twin Tunnel by shield TBM, Tunnel by Cut & Cover, Underground ramp at Derawal Nagar and Six underground stations viz. 2444.828 crore, but I’m not sure if that is still current. Other packages are 12.375 km DC-01, 7.473 km DC-03R, 2.03 km underground DC-06 – all of which are under construction.ĭMRC had previously estimated DC-05 to cost Rs. This is the 4th (and final) civil package of the Magenta Line’s 28.92 km Janakpuri West – RK Ashram extension. This 7.46 km underground section connects a ramp north of Derawal Nagar with RK Ashram via 6 stations at Derawal Nagar, Ghanta Ghar, Pulbangash (interchange with Red Line), Sadar Bazar, Nabi Karim & Ramakrishna Ashram Marg (interchange with Blue Line). DC-08: Tata Projects is L1 (Silver Line’s 6.11 km Aerocity to Kishangarh section with 4 stations).DC-07: Afcons is L1 (Silver Line’s 6.477 km Sangam Vihar to Tughlakabad section with 3 stations).DC-05: Afcons is L1 (Magenta Line’s 7.46 km Derawal Nagar to RK Ashram section with 6 stations).NovemOriginal Post: Afcons Infrastructure and Tata Projects Ltd (TPL) today emerged as the lowest bidders for constructing 3 underground tunneling packages (DC05, DC07 & DC08) of the 65.1 km Delhi Metro Phase 4 project.ĭelhi Metro Rail Corporation (DMRC) had invited bids for all 3 civil packages in May & June 2021 with a 42 month deadline financed by JICA through a Rs 8,390 crore ODA loan. JanuUpdate: DMRC has issued LOA for DC-07 to Afcons Infrastructure with a contract value of Rs. JanuUpdate: DMRC has issued LOA for DC-05 to Afcons Infrastructure with a contract value of INR 2404,99,99,990.71 + EURO 85,79,782 (Approx. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |